Installation considerations of BC Series Battery Cabinet

With the size of power cabinet, and then check the appearance of equipment, ensure matching wtih the selected support. A rugged cabinet can bearing weighing up to 450 pounds, so it is necessary to check the tools that handling equipment, such as lifting or trolley. The power distribution cabinet on wheels, so you only need to put the equipment installed in the cabinet, pushed to the right place. Measure the size of the room and the height of the ceiling, doors and lift to make sure that the cabinet can be passed. In addition, consider to the many types of equipment in the cabinet, to ensure that the cabinet is near the power, network cable spigot and communication socket. Check the angle of cabinet door open and closed. Standard cabinet door open on the right and the hinge on the left, of course, does not rule out the opposite situation. All the doors and side panels should be easy to open, easy to maintain. When you want to install equipment cabinet into an existing group, you can put the cabinet next to a row, looks safe and tidy. Some group due to various reasons, can not be increased, or only adding several accessories. The good cabinet model group should have full scalability, and with all the necessary hardware, remove the side panels of the cabinet, connect the cabinet to each other in a row by screws.

评论

此博客中的热门博文

How to maximize the efficiency of your UPS

126th Canton Fair

Why the IDC needs to be equipped with UPS