1.Before using the power supply, make sure whether the input and output voltage specifications are consistent with the nominal values of the power supply.
2.Before electrifying, check if the input and output leads are connected correctly, so as not to damage user equipment.
3.Check whether the installation is solid, whether there is contact between the installation screws and the power supply devices, and measure the insulation resistance of the housing and input and output, so as to avoid electric shock.
4.In order to ensure safety and reduce interference, ensure that the grounding terminal is reliably grounded.
5.The output power is usually divided into main and auxiliary output, and the main output characteristic is superior to the auxiliary output. In general, the output current is large and the output is mainly. In order to guarantee the output load adjustment rate and output dynamic performance, it is generally required to carry at least 10% load per route. If the auxiliary road does not use the main road, the main road must add proper false loads. Refer to the specification of the corresponding model.
6.Please note that power frequent switch will affect its life.
7.The working environment and the degree of load will also affect their life.

SOROTEC SP6U-48200 48V Switching Power Supply Embedded System

1.Constructed with standard 19 inch screen, which has the advantage of wide use.
2.The data center area and the installation cost can be saved due to its small size and the embedded installation.
3.Wide input voltage range (85-290Vac), the power grid is adaptable.
4.Perfect lightning protection.
5.Rectifiers are hot-pluggable. Easy and quick on line maintenance.
6.The rectifier uses DSP (Digital Signaling Processor) ology, makes the power density ran up to 14W/In3.
7.Battery management, prolongs the life of the battery well.
8.Have passed CE, UL, TLC, and other related certifications.
9.Excellent energy conservation and environmental protection.