Installation considerations of power control cabinet

With the size of power supply cabinet, and then check the appearance of equipment, ensure matching wtih the selected support. A rugged cabinet can bearing weighing up to 450 pounds, so it is necessary to check the tools that handling equipment, such as lifting or trolley. The cabinet on wheels, so you only need to put the equipment installed in the power control cabinet, pushed to the right place. Measure the size of the room and the height of the ceiling, doors and lift to make sure that the cabinet can be passed. In addition, consider to the many types of equipment in the cabinet, to ensure that the power supply cabinet is near the power, network cable spigot and communication socket. Check the angle of power control cabinet door open and closed. Standard cabinet door open on the right and the hinge on the left, of course, does not rule out the opposite situation. All the doors and side panels should be easy to open, easy to maintain. When you want to install equipment power supply cabinet into an existing group, you can put the cabinet next to a row, looks safe and tidy. Some group due to various reasons, can not be increased, or only adding several accessories. The good cabinet model group should have full scalability, and with all the necessary hardware, remove the side panels of the power supply cabinet, connect the power control cabinet to each other in a row by screws.

This blog is published by china ups maufacturer SOROTEC

评论

此博客中的热门博文

Correct selection of backup time for UPS

126th Canton Fair

How to maximize the efficiency of your UPS